Jerry running the passenger train
through the Lancaster Train Station. |
Electrical board under Jerry's train layout.
|
Yellow controller for the Yellow Crew Chief.
|
The control panel which is operated by the "Tower Operator."
|
Walkie-Talkies for communication.
|
The Fast Clock.
|
Lancaster Train Station.
|
Freight train leaving the station.
|
Engines waiting their turn on the layout. The wiring above the trains is the catenary that is used to power electrical trains in real life. The panograph units on the top of the two engines on the right can be raised so they touch the wiring and will electrify the engines.
|
One of Jerry's new additions to his layout.
|
The circus is another new addition that is in the process of being constructed. Jerry's wife, Just Sue, has sewn the tents that are on the right of the photo. Jerry's old house in our neighborhood is in the rear behind the circus.
|
Fisheye view shows the Landisville branch of Jerry's layout.
|
Great job, LDub. Too bad you don't live closer so you could join in the "playing". JS
ReplyDelete